首页> 外文会议>Annual International Bridge Conference >Emergency Micropile Retrofit for the Interstate 94 Bridge over Riverside Drive
【24h】

Emergency Micropile Retrofit for the Interstate 94 Bridge over Riverside Drive

机译:沿河行驶的94号州际公路大桥的应急微桩改造

获取原文
获取外文期刊封面目录资料

摘要

Reconstruction of the Interstate 94 (I-94) bridges over Riverside Drive required staged part-width construction tomaintain traffic in both directions for the Michigan Department of Transportation (MDOT). During the initial stage(Stage I) of the bridge construction, movements of the existing I-94 bridges and Riverside Drive were significantenough to require temporary closures and emergency stabilization and repair of the I-94 Bridges. The eastbound (EB)lanes remained closed until the existing pier footings were retrofitted using micropiles. Settlement monitoringincluded the use of an automated monitoring system to confirm reduced movements.
机译:重建Riverside Drive上的94号州际公路(I-94)桥梁需要分阶段进行部分宽度的施工 保持密歇根州交通运输部(MDOT)的双向交通。在初始阶段 桥梁建设(第一阶段),现有I-94桥梁和Riverside Drive的移动非常重要 足以临时关闭I-94桥并进行紧急稳定和维修。东行(EB) 车道一直保持封闭,直到使用微型桩对现有的码头基础进行了改造。沉降监测 包括使用自动监控系统来确认运动减少。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号