首页> 外文会议>International conference on modelling and simulation;ICMS2010 >Analysis on Concrete's Measures for Qin river Inverted-Siphons in winter
【24h】

Analysis on Concrete's Measures for Qin river Inverted-Siphons in winter

机译:冬季沁河倒虹吸混凝土措施分析

获取原文

摘要

The inverted siphon is thin-walled concrete structure, and cracks will appear according to temperature loads. Generally speaking, the temperature difference between the internal and external and the basic difference of temperature are considered as the main factors influencing the cracks. Using the basic theories of temperature and stress field of concrete, the 3-D FEM is adopted to simulate the stresses field of Qin river inverted siphon during construction. Through analyzing the time-space variation law, the site that cracks easily appear is obtained.In the part of the middle line of the South- North Water Transfer Project, for the first time, the quality of concrete surface has been improved obviously through the method of external insulation board. The temperature control method of posting template outside the high-pressure polyethylene insulation board is economically reasonable and technically feasible in terms of crack control measures, thus it can serve as valuable reference for other similar projects
机译:倒虹吸管是薄壁混凝土结构,根据温度负荷会出现裂缝。一般来说,内部和外部之间的温差和温度的基本差被认为是影响裂纹的主要因素。利用混凝土的温度和应力场的基本理论,采用3-D有限元模拟秦河倒虹吸管施工过程中的应力场。通过分析时空变化规律,得出了容易出现裂纹的部位。在南水北调工程中线部分,首次通过水力法明显改善了混凝土表面质量。外部绝缘板的方法。就防裂措施而言,在高压聚乙烯保温板外面张贴模板的温度控制方法在经济上是合理的,在技术上是可行的,因此可以为其他类似项目提供有价值的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号