首页> 外文会议>International Conference on Hydroinformatics >Research on the Strength and Space-time Distribution of Sedimentation of Yi-Zheng Segment in Phase- II Project of Deep Water Channel Construction of Yangtze River
【24h】

Research on the Strength and Space-time Distribution of Sedimentation of Yi-Zheng Segment in Phase- II Project of Deep Water Channel Construction of Yangtze River

机译:长江深水通道施工叶铮段沉降力量和时空分布研究

获取原文

摘要

Phase- II Project of Deep Water Channel Construction of Yangtze River(2014-2015), including the Yi-Zheng Segment, enables the water depth of Yangtze River Channel between Nanjing and Nantong arrive 12.5 meters. This thesis analyzes the sedimentation movement of Yi-Zheng Segment with mathematical model, makes prediction of the sediment's strength and space-time distribution. The simulation results indicate that the yearly dredging quantity of 1998 and 2010, two typical hydrological years, are 1.528 million m3 and 0.499 million m3 separately. The main maintenance months are October, November and December during the dry season, while the main maintenance parts are the channel from Dadaohe to Majiakou, the channel from Majiakou to Qibaidu, the channel from Qibaidu to Longmenkou in the right branch of Shiyezhou. These results could be helped to provide support of later dredging operation for keeping deep water Channel of Yi-Zheng Segment.
机译:长江(2014-2015)深水通道建设的第二阶段项目,包括义铮段,使南京和南通之间的长江渠道水深到达12.5米。本文分析了易铮段与数学模型的沉降运动,使沉积物的强度和时空分布的预测。仿真结果表明,1998年和2010年的年疏浚数量,两个典型的水文年,分别为15.28亿立方米和0.499亿立方米。主要的维护月份是10月,11月和12月在旱季期间,主要的维护部分是从大岛到Majiakou的频道,来自Majiakou到Qibaidu的频道,来自Qibaidu到龙门家的频道在施云州的右手。这些结果可以有助于提供后续疏浚操作的支持,以保持义铮段的深水通道。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号