首页> 外文会议>World Dredging Congress >THE TREATMENT SCHEME OF REMAINED WATER AND ANALYSIS OF MONITORING RESULTS FOR ENVIRONMENTAL DREDGING PROJECT: TAKING ENVIRONMENTAL DREDGING PROJECT ON ZHUSHAN AREA OF TAIHU LAKE AS AN EXAMPLE
【24h】

THE TREATMENT SCHEME OF REMAINED WATER AND ANALYSIS OF MONITORING RESULTS FOR ENVIRONMENTAL DREDGING PROJECT: TAKING ENVIRONMENTAL DREDGING PROJECT ON ZHUSHAN AREA OF TAIHU LAKE AS AN EXAMPLE

机译:环境疏浚项目监测结果的剩余水分分析:以太湖朱山地区为例

获取原文

摘要

In the ecological desilting project in Zhushanhu of Taihu Lake, according to the situation, adding flocculant is the method adopted to treat the remained water around the discharge area for the first time, which is a method that aims to effectively control the water quality. In the experimental production, it is proved to be effective and worth promotion after improvem6ent. This paper gives an analysis on the overall improvement effect of the fiocculant and water quality according to the design of the remained water treatment equipment adopted in the project and the on-operation approach of the remained water treatment. The conclusion is made from three aspects:the relationship between density of fiocculant and the production quantity of flocculent precipitate or flocculating timethe relation between the quantity of fiocculant and the value of suspended matters in the remained water as well as the water quality indexthe direct relation between the final quantity of the fiocculant and the project quantity of the desilting work.
机译:根据太湖湖的生态脱水项目,根据情况,添加絮凝剂是首次采用围绕排放区围绕排放区的剩余水的方法,这是有效控制水质的方法。在实验生产中,在发生后,它被证明是有效和值得推广。本文根据项目中采用的剩余水处理设备的设计和剩余的水处理的开启方法,介绍了近距离水质和水质的总体改善效果分析。结论是由三个方面进行的:散热体密度与絮凝剂沉淀物的浓度和絮凝物的生产量之间的关系,并且在剩余的水中的悬浮物的数量和悬浮物的价值之间以及水质指数之间的直接关系最终数量的光纤工人和森林植物的项目数量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号