首页> 外文期刊>重庆大学学报(英文版) >Substituted plan analysis in the environmental impact assessment of Yongchuan wastewater treatment project
【24h】

Substituted plan analysis in the environmental impact assessment of Yongchuan wastewater treatment project

机译:永川污水处理项目环境影响评价中的替代方案分析。

获取原文
获取原文并翻译 | 示例
       

摘要

Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.
机译:环境影响评价(EIA)中的替代方案主要是指处理技术和植物替代场所,还包括多种环境保护措施。本文将对永川污水处理项目的处理技术,设备替代场所,排水目的和污泥处理进行详细分析。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号