首页> 外文会议>Pacific structural steel conference >STRUCTURAL DESIGN AND CONSTRUCTION OF TERMINAL BUILDING FOR KWANG-MYEONG HIGH-SPEED RAILWAY STATION
【24h】

STRUCTURAL DESIGN AND CONSTRUCTION OF TERMINAL BUILDING FOR KWANG-MYEONG HIGH-SPEED RAILWAY STATION

机译:广岛高速火车站码头建设的结构设计与施工

获取原文

摘要

The terminal building for Kwang-Myeong high-speed railway station, one of the 7 brand new stations on the Kyung- Bu line in Korea, was constructed at the end of 2003. This building is composed of steel roof structures and reinforced concrete structures for two stories below. The steel roof covering 8 rail-lanes is 306 meters (m) long and 106.5 m wide. The central roof truss is 3-hinged with Vierendeel arches, and each aisle roof of Vierendeel trusses is crescent shaped. The structural components are connected at 23 kinds of cast steel joints.
机译:Kwang-Myeong高速火车站的航站楼是韩国Kyung-Bu系列的7个全新电台之一,于2003年底构建。该建筑由钢屋顶结构和钢筋混凝土结构组成 下面的两个故事。 钢屋顶覆盖8个轨道车道,长306米(m),宽106.5米。 中央屋顶桁架3-铰接与vierendeel拱门,并且vierendeel桁架的每个过道屋顶都是新月形的。 结构部件以23种铸钢接头连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号