Cross joint and box-shaped conversion column welding technology

机译:交叉接头和箱形转换柱焊接技术

获取原文

摘要

The groun part of the main building of global center construction of Kaiyuan, Hebei Province is 53 layers and the underground part is four layers and the total height is 242. 8m, and the building of the project will become the high est one in North China except Beijing and Tianjin after the completion. The inner part of the project is cylinder type while the outer part is frame type; the cylinder body is a section steel concrete structure and the outer frame is steel structure,wherein,the outer frame steel column begins to convert from cross shape to box shape since 4-5 layers on the surface and the web of cross shaped column at the conversion part stretches about 1,500mm into the box-shaped column forming a structure like the shape of Chinese character of " 田 ". This kind of section are rarely seen in for mer steel structure construction,and welding cannot be implemented between cross web and box-shaped flange firth during the processing and grooves are need to be dug on the box-shaped flange firth to fulfill plug welding on places where welding is required,in this way,much welding needs to be implemented at the conversion part and shrinkage and deformation of welding are also bigger. The article mainly makes an introduction of production welding proce dure of cross joint and box shaped conversion column and briefly states the production welding procedure of cross joint and box-shaped conversion column and existing problems to supply cross joint and box-shaped conversion col umn production welding procedure with experience and references.
机译:河北省开元全球建设主楼的主楼是53层,地下部门是四层,总高度为242.8米,该项目的建设将成为华北地区的高埃斯特除了北京和天津完成后。该项目的内部是气缸类型,而外部部分是框架类型;气缸体是钢筋混凝土结构,外框架是钢结构,其中,外框架钢柱开始从横向形状转换为箱形状,因为在表面上的表面和交叉形柱网上的4-5层转换部分将约1,500mm拉伸到盒形柱中,形成像“田”的汉字形状的结构。这种部分很少看到MEL钢结构结构,并且在跨幅材和盒形法兰蠕动之间不能在加工过程中实现焊接,并且需要在箱形法兰纤维上挖出凹槽以实现塞焊接需要焊接的地方,以这种方式,需要在转换部门进行多种焊接,并且焊接的收缩和变形也更大。本文主要制定了横截面和箱形转换柱的生产焊接焊接的引入,并简要地说明了交叉接头和箱形转换柱的生产焊接程序以及供应交叉接头和箱形转换COL UMN生产的现有问题具有经验和参考的焊接程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号