DR 2 (Danish Reactor 2), one of the research reactors at the Ris? site, has been in the process of beingdecommissioned during the last two years. The decommissioning will be completed in 2008.The reactor went critical for the first time in late 1958 and was shut down in 1975. The construction was a 5 MWlight-water moderated and cooled tank type reactor.Although the process of decommissioning was formally initiated in 2005, it was preceded by a characterizationproject with the purpose of determining activity contents in key materials and dose rates at relevant spots in the reactor.The paper describes the removal of neutron beam plugs, grid plate and a thermal column with focus on radiationprotection issues. The primary objective is, however, to describe the measures taken to control radiation doses duringthe removal of the reactor block concrete and the reactor tank.The demolition and removal of concrete was done by an external contractor. The contractor had to comply with acomprehensive set of requirements. This included splitting activated concrete from concrete containing activitiesbelow clearance levels with no use of fluids of any kind, as the risk of not being able to control diffusion of contaminatedfluids was an important issue.The experience from the decommissioning of the DR 1 reactor in 2005 showed that water-cooled cutting made itvery difficult to monitor the levels of air contamination as the filters of the air monitors were blocked frequently.Certainly, dry cutting turned out to be a great technical challenge to the external contractor.Another demand was that the work should take place inside a de-pressurized containment in order to control aircontamination and thereby minimize internal doses.The experience gathered from the practical implementation of dose reducing measures will be discussed.Problems involving the use of external contractors will be discussed, including training of personnel with no priorknowledge of radioactivity and radiation.Possible conflicts between project management interests and radiation protection issues will be addressed.
机译:DR 2(丹麦反应堆2)是Ris?的研究堆之一。网站,一直在 在过去两年中退役。退役将在2008年完成。 该反应堆在1958年末首次成为关键反应堆,并于1975年关闭。该反应堆的制造功率为5兆瓦 轻水缓冷槽式反应堆。 尽管退役过程于2005年正式启动,但在此之前进行了表征 该项目旨在确定反应堆中相关部位关键材料中的活性含量和剂量率。 该论文描述了以辐射为重点的中子束塞,格栅板和热柱的拆除 保护问题。但是,主要目的是描述为控制辐射剂量而采取的措施。 拆除反应堆混凝土和反应罐。 拆除和清除混凝土是由外部承包商完成的。承包商必须遵守 全面的要求。这包括从含混凝土的活动中分裂活化的混凝土 低于清除水平,不使用任何种类的液体,因为存在无法控制污染物扩散的风险 液体是一个重要的问题。 DR 1反应堆在2005年退役的经验表明,水冷切割使其成为 由于空气监测器的过滤器经常堵塞,因此很难监测空气污染程度。 当然,干切对外部承包商而言是一项巨大的技术挑战。 另一个要求是,该工作应在减压容器内进行,以控制空气 污染,从而使内部剂量最小化。 将讨论从减少剂量措施的实际实施中获得的经验。 将讨论涉及使用外部承包商的问题,包括对没有事先培训的人员进行培训 放射性和辐射知识。 将解决项目管理利益与辐射防护问题之间可能存在的冲突。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号