首页> 外文会议>European conference on product and process modelling >A graph-based prediction method for electrical wiring in old residential buildings as a part of BIM for Urban Mining purposes
【24h】

A graph-based prediction method for electrical wiring in old residential buildings as a part of BIM for Urban Mining purposes

机译:一种基于图的旧住宅建筑物电气布线预测方法,作为城市采矿的一部分BIM

获取原文

摘要

The paper presents a concept for determining the location of the electrical wiring in a flat in old residential buildings in Germany. The implementation of the method requires the availability of floor plans of the flat either as physical documents or as digital files which have to be completed with the approximate position of the electrical outlets on the walls. The aim is to show how the single electrical outlets are connected to each other considering the wiring zones allowed by the German norms.
机译:本文提出了一种确定在德国老住宅建筑中的电气布线的位置的概念。该方法的实施要求将公寓的平面图的可用性作为物理文档或作为必须以墙壁上的电插座的近似位置完成的数字文件。目的是展示单个电源插座的考虑德国规范允许的布线彼此相互连接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号