Assessing the Risk of Islanding for Distribution Connected Type 4 Wind Energy Converters

机译:评估分销岛岛屿的风险连接型4风能转换器

获取原文

摘要

The integration of wind farms into distribution systems requires consideration of a number of protection and control issues. As with any distributed generation, wind farms (WFs) are required to meet the utility's interconnection requirements, one of which is anti-islanding protection. This paper evaluates the islanding risk associated with a 15 MVA WF equipped with full converter, i.e. type 4, wind energy converters (WECs) connected to a rural distribution feeder. Using detailed wind farm and distribution system models, parametric studies were conducted for load and generation levels and different WF control modes. Results show that the intertie protection is able to successfully identify all islanding conditions. Considering the breadth of cases considered, it was concluded that local protections are sufficient to meet the anti-islanding requirement and a transfer-trip scheme is not necessary.
机译:风电场转化为分配系统的整合需要考虑一些保护和控制问题。与任何分布式发电一样,风电场(WFS)需要满足公用事业的互连要求,其中一个是反岛屿保护。本文评估了与配备完整转换器的15个MVA WF相关的岛屿风险,即类型4,有关农村分配馈线的风能转换器(WEC)。使用详细的风电场和分配系统模型,进行负载和生成水平和不同WF控制模式的参数研究。结果表明,内部保护能够成功识别所有岛屿条件。考虑到案件的广度考虑,它的结论是,当地保护足以满足反岛屿要求,而不是必要的转移行程方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号