首页> 外文会议>2014 IEEE PES Tamp;D Conference and Exposition >Assessing the risk of islanding for distribution connected type 4 wind energy converters
【24h】

Assessing the risk of islanding for distribution connected type 4 wind energy converters

机译:评估分配连接的4型风能转换器的孤岛风险

获取原文
获取原文并翻译 | 示例

摘要

The integration of wind farms into distribution systems requires consideration of a number of protection and control issues. As with any distributed generation, wind farms (WFs) are required to meet the utility's interconnection requirements, one of which is anti-islanding protection. This paper evaluates the islanding risk associated with a 15 MVA WF equipped with full converter, i.e. type 4, wind energy converters (WECs) connected to a rural distribution feeder. Using detailed wind farm and distribution system models, parametric studies were conducted for load and generation levels and different WF control modes. Results show that the intertie protection is able to successfully identify all islanding conditions. Considering the breadth of cases considered, it was concluded that local protections are sufficient to meet the anti-islanding requirement and a transfer-trip scheme is not necessary.
机译:将风电场集成到配电系统中需要考虑许多保护和控制问题。与任何分布式发电一样,需要风电场(WF)来满足公用事业的互连要求,其中之一是防孤岛保护。本文评估了配备15 MVA WF并配备完整变流器(即4型,连接到农村配电馈线的风能变流器(WEC))的孤岛风险。使用详细的风电场和配电系统模型,对负荷和发电水平以及不同的WF控制模式进行了参数研究。结果表明,关联保护能够成功识别所有孤岛情况。考虑到所涉案件的广度,得出的结论是,当地保护足以满足反孤岛的要求,因此无需转机方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号