首页> 外文会议>Proceedings of the 5th International Conference on Computer Science and Education >Study on the fuzzy comprehensive evaluation of the railway emergency plan based on G2 method
【24h】

Study on the fuzzy comprehensive evaluation of the railway emergency plan based on G2 method

机译:基于G2方法的铁路应急预案模糊综合评价研究。

获取原文

摘要

Given the particularity of rail transport, the damage and losses caused by the railway emergency are often severe. Therefore, establishing the evaluation index system and making effective assessment of the corresponding emergency plan is of great importance for reducing the damage and loss of the incidents. In this paper, according to the characteristics of railway emergency plan, the evaluation index system is firstly established. Then combined with the expert judgments, G2 method is used in the calculation of the index weights, with which the consistency check in AHP is effectively avoided, and thus the fuzzy evaluation method is cited to make a comprehensive evaluation on the emergency plan, which not only combined quantitatively and qualitatively but also make subjective evaluation objective, so the accuracy of the evaluation have been improved. Finally it gives an example to verify the rationality and reliability of the proposed method, which provide the effective assessment to the railway emergency for reference.
机译:考虑到铁路运输的特殊性,铁路紧急情况造成的破坏和损失往往很严重。因此,建立评估指标体系,并对相应的应急预案进行有效评估,对于减少事故的损失和损失具有十分重要的意义。本文根据铁路应急预案的特点,首先建立了评价指标体系。然后结合专家判断,在指标权重的计算中采用G2法,有效避免了层次分析法中的一致性检验,因此采用模糊评价法对应急预案进行综合评价,没有对应急方案进行综合评价。不仅定量和定性地结合,而且使主观评价成为客观,从而提高了评价的准确性。最后通过实例验证了所提方法的合理性和可靠性,为铁路突发事件的有效评估提供参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号