首页> 外文会议>Geotechnical aspects of underground construction in soft ground >3D finite element analysis of a deep excavation and comparisonwith in situ measurements
【24h】

3D finite element analysis of a deep excavation and comparisonwith in situ measurements

机译:深基坑的3D有限元分析以及与原位测量的比较

获取原文

摘要

The paper describes the analysis of a deep excavation project in clayey silt in Salzburg. Theexcavation was supported by a diaphragm wall, a jet grout panel and three levels of struts. Because of insufficientinformation on the material properties of the jet grout panel the stiffness of it was varied in a parametric study.Theeffect of taking into account the stiffness of a cracked diaphragm wall on the deformations was also investigated.In some of the 3D calculations a non-perfect contact between diaphragm wall and strut was simulated by meansof a non-linear behaviour of the strut. The evaluation of the results and comparison with in situ measurementsshowed that analyseswhich took into account the reduced stiffness of the diaphragmwall due to cracking achievedthe best agreement with the measurements. Furthermore settlements of buildings could be best reproduced bythe three-dimensional model.
机译:本文描述了萨尔茨堡粘土质粉砂土深基坑工程的分析。这 开挖由隔板墙,射流灌浆板和三层支撑支撑。由于不足 有关喷浆板材料特性的信息,其刚度在参数研究中有所不同。 还研究了考虑到开裂的隔板壁的刚度对变形的影响。 在某些3D计算中,通过以下方法模拟了隔板壁和支杆之间的非完美接触 的非线性行为。结果评估并与原位测量进行比较 结果表明,该分析考虑了由于开裂而引起的隔板壁刚度降低的问题 与测量结果的最佳吻合。此外,建筑物的定居点最好由 三维模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号