首页> 外文会议>Geotechnical aspects of underground construction in soft ground >Challenging urban tunnelling projects in soft soil conditions
【24h】

Challenging urban tunnelling projects in soft soil conditions

机译:在软土条件下挑战性的城市隧道工程

获取原文

摘要

Different challenging tunnel projects in the downtown area of the city of Mainz in Germanyare presented. These tunnels run parallel in a distance of 4m to max. 50 m. The tunnels were built in soft soilconditions consisting of filling, clay and marl layers of the Tertiary. The paper presents the different constructiontechniques, the calculation methods for the two tunnels as well as the results of measurements for the NewTunnel Mainz. The experience for the construction of this tunnel and the results of the measurements were thebasis for the chosen construction and calculation method for the rehabilitation of the Old Tunnel Mainz, whichis currently under construction.
机译:德国美因茨市区不同的具有挑战性的隧道项目 被提出。这些隧道平行延伸,最大距离为4m。 50公尺。隧道是在柔软的土壤中建造的 由第三纪的填充,粘土和泥灰岩层组成的条件。本文介绍了不同的构造 技术,两条隧道的计算方法以及新隧道的测量结果 隧道美因茨。该隧道的建设经验和测量结果是 美因茨老隧道修复的选定施工和计算方法的依据,其中 目前正在建设中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号