Dynamic loads for high-strain dynamic pile testing

机译:用于高应变动力桩测试的动载荷

获取原文

摘要

The main purpose of high strain dynamic pile testing is the determination of the pile capacity at the time of testing. It is important to know the magnitude of the applied dynamic load in high-strain testing. Nevertheless, there are no widely accepted requirements for producing or measuring the load except that the pile capacity must be fully mobilized during dynamic testing. A simplified procedure to calculate short-duration impact loads is suggested that takes into consideration pile capacity and parameters when performing high-strain dynamic pile tests. Comments are also included regarding the current CAPWAP, TNOWAVE, and SIMBAT methods for determination of pile capacity by high-strain dynamic pile testing.
机译:高应变动力桩测试的主要目的是在测试时确定桩容量。重要的是要知道在高应变测试中施加的动态载荷的大小。然而,除了必须在动态测试过程中充分调动桩的容量之外,对于产生或测量载荷没有广泛接受的要求。建议进行简化的计算短期冲击载荷的程序,该程序在进行高应变动态桩测试时要考虑桩的容量和参数。还包括有关当前的CAPWAP,TNOWAVE和SIMBAT方法的评论,这些方法用于通过高应变动态桩测试来确定桩容量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号