US-50 extends west to east in Colorado from Grand Junction to Pueblo and beyond traversing through the rugged terrain of the Central Rocky Mountains and is lined with steep natural and constructed rock slopes. A rockfall mitigation analysis and design was requested by the Colorado Department of Transportation (CDOT) for an existing rock slope on US-50 between MP 242.2 and MP 242.6 near Coaldale in Central Colorado. The rock slope ranges in height from 100 to 300 feet and forms blind corners with limited rockfall catchment zones. The Arkansas River is immediately north of and parallels the road and rock slope.In the spring of 2007, the authors conducted detailed geologic mapping of the rock slope using mountaineering techniques. Based on our mapping and mitigation analysis, blocks of concern and areas of rockfall were identified along the slope and recommendations for mitigation were developed. In conjunction with CDOT, detailed design plans and specifications for mitigation of the rockfall hazards were prepared. Mitigation began in September 2008 to stabilize the areas of concern. Because of the proximity of the Arkansas River, netting was suspended from a crane during scaling to reduce the potential for rockfall into the river. Modified rockfall nets were suspended in gullies and large rock blocks were anchored to the slope. Additionally, a joint team from CDOT and Kleinfelder engineers installed crack monitoring devices along the base and side of a large potentially unstable block to remotely monitor movement because of its size and location on the slope.
机译:US-50在科罗拉多州从大章克申向东延伸至普韦布洛(Pueblo),并穿越中洛矶山脉崎Rock的地形,两旁都是陡峭的自然和人造岩石斜坡。科罗拉多州交通运输部(CDOT)要求对US-50上位于科罗拉多州中部Coaldale附近MP 242.2和MP 242.6之间的现有岩质边坡进行减石分析和设计。岩石坡度的高度范围从100到300英尺,并形成了有限的落石集水区的盲角。阿肯色河就在道路和岩石坡度的北部,并与之平行。 在2007年春季,作者使用登山技术对岩质边坡进行了详细的地质测绘。根据我们的地图和减灾分析,在斜坡上确定了关注区域和落石区域,并提出了减灾建议。与CDOT一起,制定了减轻岩崩危害的详细设计计划和规范。缓解措施于2008年9月开始,以稳定关注的领域。由于靠近阿肯色河,在结垢过程中将网从起重机上吊下来,以减少落入河中的可能性。修改后的落石网悬挂在沟渠中,大块岩石锚固在斜坡上。此外,由CDOT和Kleinfelder工程师组成的联合团队在一个潜在的不稳定大块的底部和侧面安装了裂缝监测设备,以远程监测运动,因为它的大小和在斜坡上的位置。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号