首页> 外文会议>International symposium on geological engineering problems in major construction projects;Asian regional conference of IAEG >Engineering geological problems in the planning and construction of long and large scale mountain tunnels -Case studies in Japan and advice from my experiences
【24h】

Engineering geological problems in the planning and construction of long and large scale mountain tunnels -Case studies in Japan and advice from my experiences

机译:大型山区隧道的规划和建设中的工程地质问题-日本的案例研究和我的经验建议

获取原文

摘要

In this study, the new method for quantitative and efficient measurement for the ground surface movement was developed. The feature of this technique is to identify geomorphic characteristics by image matching analysis, using the intelligent images made from high resolution DEM. This method is useful to extract the small ground displacement where the surface shape was not intensely deformed.
机译:在这项研究中,开发了定量和有效测量地表运动的新方法。该技术的特征是使用高分辨率DEM生成的智能图像,通过图像匹配分析来识别地貌特征。此方法可用于提取表面形状未剧烈变形的较小地面位移。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号