首页> 外文会议>International Mineral Processing Congress >Expansion from 18 Mtons to 36 Mtons at the Aitik Concentrator
【24h】

Expansion from 18 Mtons to 36 Mtons at the Aitik Concentrator

机译:Aitik选矿厂的产能从18吨扩大到36吨

获取原文

摘要

The Aitik copper mine is located in the north of Sweden and the concentrator at the mine started its operation in 1968 with a capacity of 2 Mton ore per year.Since then the operation has expanded several times,and today the capacity is 18 Mton ore per year.A new expansion plan was investigated in 2005,however the building of a new concentrator was found to be a better solution,giving a lower cost,a longer lifetime and more concentrates to the smelter at the coast.Several choices have been evaluated regarding the location of the concentrator's crushing,grinding,dewatering,process control and water systems.The energy cost comparison has been an important factor when evaluating the various choices.The single most important decision has been in choosing the grinding system.Once again the fully autogenous grinding system,favoured by Boliden,has proven to be the best solution.The location of the mill,high and near the tailing pond,gives lower transportation costs for the ore and railings,compared to other locations.A new water system will lower the pumping cost,give better control of water circulation to the plant and create fewer problems with permafrost in the tailings disposal area.Molybdenum recovery will be installed in the new plant using a separate circuit.A gold leaching plant was also investigated.Gold leaching is planned for the pyrite concentrate from the chalcopyrite/pyrite separation and the concentrate from the desulphurisation circuit that will be installed on the bulk flotation tailings.
机译:Aitik铜矿位于瑞典北部,该矿的选矿厂于1968年开始运营,年产能为2吨矿石。此后,该业务已扩大了数倍,如今的产能为每吨18吨矿石。 2005年对新的扩建计划进行了研究,但是发现建造新的选矿厂是更好的解决方案,成本更低,使用寿命更长,并且对沿海冶炼厂的精矿也更多。选矿厂的破碎,研磨,脱水,过程控制和水系统的位置。能源成本比较是评估各种选择时的重要因素。最重要的决定是选择研磨系统。事实证明,Boliden偏爱的研磨系统是最佳的解决方案。磨机的位置,尾矿池的高处和附近,降低了矿石和栏杆的运输成本与其他地方相比,新的供水系统将降低抽水成本,更好地控制工厂的水循环,并减少尾矿处置区永久冻土的问题。钼的回收将通过单独的回路安装在新工厂中。还对金浸出厂进行了研究,计划将金浸出用于黄铜矿/黄铁矿分离中的黄铁矿精矿以及来自脱硫回路的精矿,这些精矿将安装在散装浮选尾矿上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号