首页> 外文会议>World environmental and water resources congress >DEVELOPING A WATER BUDGET FOR A CONSTRUCTED STORMWATER WETLAND
【24h】

DEVELOPING A WATER BUDGET FOR A CONSTRUCTED STORMWATER WETLAND

机译:为建造的雨水湿地制定水预算

获取原文

摘要

A thorough understanding of the hydrology of a constructed stormwater wetland (CSW) is essential to develop a water budget; that is a comprehensive view of all inputs and outputs in the system. Two of the principal functions of a CSW are to 1) reduce peak flows and 2) improve water quality. The latter is achieved through biological, chemical, and physical processes that are ultimately governed by the hydraulics and hydrology of the system. As these built systems populate the watershed management landscape, it is necessary to account for all flows that pass through the CSW to ensure that it is providing a benefit and does not have any deleterious effects on the watershed. One of the most significant and least understood aspects of a CSW is the groundwater-surface water exchange. This exchange is difficult to quantify, but is deserving of consideration because of the potential impact this exchange has on groundwater and surface water quantity and quality in a CSW system. Therefore, the goals of this study are to 1) use hydraulic and hydrologic computer models to create a water budget of the CSW, with a focus on quantifying groundwater-surface water fluxes, and 2) discuss the implications of how hydraulic and hydrologic processes affect the water quality within a CSW.
机译:彻底了解构建的雨水湿地(CSW)水文(CSW)对于开发水预算至关重要;这是系统中所有输入和输出的全面视图。 CSW的两个主要功能为1)减少峰值流动和2)提高水质。后者是通过最终由系统的液压和水性管辖的生物学,化学和物理过程实现的。由于这些构建系统填充了流域管理景观,有必要考虑通过CSW的所有流程,以确保其提供福利,并且对流域没有任何有害影响。 CSW最重要和最不理解的方面之一是地下水地水交换。这种交流难以量化,但由于这种交换对地下水和地表水量和质量的潜在影响,这是值得考虑的。因此,本研究的目标是1)使用液压和水文计算机模型来创造CSW的水预算,重点是量化地下水位水通量,2)讨论液压和水文过程如何影响的含义CSW内的水质。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号