Capping a Toothpaste Landfill and Constructing a New Landfill on Top

机译:覆盖牙膏填埋场并在顶部建造新的填埋场

获取原文

摘要

A manufacturer of silica gel was required by state regulators to close its existing filter cake landfill. The closure design needed to be flexible so that a new landfill could be constructed on top of the old one. A geotechnical evaluation of the existing filter cake was performed to determine the feasibility of constructing a landfill cap or a new landfill on top of the existing facility and to determine the amount of consolidation expected. The geotechnical evaluation determined that either closure or expansion was feasible if the site was graded to accommodate the consolidation of waste materials. About 0.7 m of consolidation would occur due to construction of the cap, and about 1.5 m if the tallest possible new landfill were constructed on top. Construction of the multiple layer cap and liner was completed in spring 2007.
机译:国家监管机构要求硅胶制造商关闭其现有的滤饼垃圾掩埋场。封闭设计必须灵活,以便可以在旧垃圾场的顶部建造新的垃圾场。对现有滤饼进行了岩土工程评估,以确定在现有设施顶部建造垃圾填埋场盖或新垃圾填埋场的可行性,并确定预期的固结量。岩土工程评估确定,如果对场地进行分级以容纳废料的合并,则关闭或扩展都是可行的。由于盖的建造,将发生约0.7 m的固结,如果在顶部建造了尽可能高的新垃圾填埋场,则将发生约1.5 m的固结。多层盖和衬管的施工已于2007年春季完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号