首页> 外文会议>Innovation, practice, safety >EFFECTIVENESS OF STEEL FIBERS VERSUS SHEAR STUD REINFORCEMENT FOR PUNCHING SHEAR RESISTANCE IN SLAB-COLUMN CONNECTIONS SUBJECTED TO BI-AXIAL LATERAL DISPLACEMENTS
【24h】

EFFECTIVENESS OF STEEL FIBERS VERSUS SHEAR STUD REINFORCEMENT FOR PUNCHING SHEAR RESISTANCE IN SLAB-COLUMN CONNECTIONS SUBJECTED TO BI-AXIAL LATERAL DISPLACEMENTS

机译:钢纤维与抗剪螺柱钢筋对双轴侧向位移的平板-柱连接的抗冲剪性能

获取原文

摘要

A study of the effectiveness of steel fiber reinforcement and headed shear studs for increasing punching shear resistance and deformation capacity of slab-column connections subjected to earthquake-induced deformations was conducted. Three large-scale slab-column subassemblies were tested under combined gravity load and bi-axial lateral displacements. The slab-column connection in the first two specimens was reinforced with hooked steel fibers in a 1.5% volume fraction, while the connection in the third specimen was reinforced with headed shear studs. All three connections were subjected to a gravity shear ratio of approximately 1/2 during application of lateral displacements. Test results indicate that the use of fiber reinforced concrete in the connection region is an effective design alternative to increase punching shear resistance and deformation capacity of slab-column connections. Maximum connection rotation, just before punching, was approximately 0.04 rad in the two fiber reinforced concrete connections. On the other hand, a peak rotation of 0.027 rad was measured in the specimen with shear stud reinforcement. Inspection of the connection after the test indicated a breakout failure of the concrete engaged by the second line of studs accompanied by severe bending of the bottom steel rail.
机译:研究了钢纤维增强材料和带头剪力钉对提高抗震变形的板-柱连接的抗冲剪强度和变形能力的有效性。在重力载荷和双轴横向位移共同作用下测试了三个大型平板柱子组件。前两个标本的平板-柱连接采用钩形钢纤维以1.5%的体积分数进行加固,而第三个标本的连接采用带头剪力螺栓进行加固。在施加侧向位移的过程中,所有三个连接都承受了大约1/2的重力剪切比。测试结果表明,在连接区域中使用纤维增强混凝土是一种有效的设计替代方案,可以提高冲切抗力和板柱连接的变形能力。刚打孔之前,两个纤维增强混凝土连接中的最大连接旋转约为0.04 rad。另一方面,在带有剪切螺柱加强件的样品中测得的峰值旋转为0.027 rad。测试后检查连接情况,发现第二根双头螺栓接合的混凝土断裂失败,同时底部钢轨严重弯曲。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号