首页> 外文会议>Innovation, practice, safety >SEISMIC DAMAGE OBSERVED ON PREFABRICATED INDUSTRIAL STRUCTURES AFTER 1999 EARTHQUAKES IN TURKEY AND PROTECTING MEASURES
【24h】

SEISMIC DAMAGE OBSERVED ON PREFABRICATED INDUSTRIAL STRUCTURES AFTER 1999 EARTHQUAKES IN TURKEY AND PROTECTING MEASURES

机译:1999年土耳其地震后预制工业结构的震害及防护措施

获取原文

摘要

structures was primarily due to the improper detailing in beam-column connections and lack of required lateral stiffness. In this study, extensive, serious damage and failures in prefabricated reinforced concrete industrial structures in the 1999 Marmara Earthquakes have been examined. To investigate the causes of the damage beside the assessment of practical imperfections, a comparision between the sets of criteria encompassed in the TEC-98, UBC-97 and EC8-98 Codes especially on the criteria of base shear force, displacement and loads acting on the nodes/connections has been made. In order to compare the above-mentioned codes a sample prefabricated structure is analysed. From this study, it is observed that the capacity dictated from TEC-98 is lower than the capacity of the other two codes. This deficiency is removed in TEC-2007.
机译:结构主要是由于梁柱连接中的细节设计不正确以及缺少所需的侧向刚度所致。在这项研究中,对1999年马尔马拉地震中预制钢筋混凝土工业结构的广泛,严重损坏和破坏进行了研究。为了评估损坏的原因,除了评估实际缺陷外,还对TEC-98,UBC-97和EC8-98规范中包含的几套标准进行了比较,特别是基础剪力,位移和作用于载荷的标准。节点/连接已建立。为了比较上述代码,分析了样本预制结构。从这项研究中可以看出,TEC-98规定的容量低于其他两个代码的容量。 TEC-2007中消除了此缺陷。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号