首页> 外文会议>10th IASTED International Conference on Power and Energy Systems 2008 >Intentional Islanding - Maintaining Power Systems Operation during Major Emergencies
【24h】

Intentional Islanding - Maintaining Power Systems Operation during Major Emergencies

机译:故意孤岛-在重大紧急情况下维持电力系统运行

获取原文

摘要

The interconnected national power system developed during the past 60 years is both reliable and efficient. During major emergencies, however, the resulting domino effect in the grid makes it advisable to break up the affected system - through intentional islanding-into independently operating power regions (IOPRs). This requires that each and every IOPR control its frequency and voltage independently. The transition from central power stations to distributed generation (DG) complicates this breakup of the interconnected system into IOPRs. While the interconnected system is controlled at the transmission line level, the system with DG must also include control at the distribution level. The inclusion of DG requires the availability of short-term and long-term energy storage facilities so that - together with demand-side management - the IOPRs can be independently operated from one another. The concept of intentional islanding will be discussed before, during and after an emergency has occurred.
机译:过去60年来开发的相互连接的国家电力系统既可靠又高效。但是,在重大紧急情况下,电网中产生的多米诺骨牌效应建议通过有意的孤岛化为独立运行的电力区域(IOPR)来破坏受影响的系统。这要求每个IOPR都独立控制其频率和电压。从中央电站到分布式发电(DG)的过渡使互连系统向IOPR的分解变得更加复杂。虽然互连系统是在传输线级别进行控制的,但具有DG的系统还必须包括配电级别的控制。包含DG要求具有短期和长期的能量存储设施,以便IOPR与需求侧管理一起可以彼此独立运行。有意孤岛的概念将在紧急情况发生之前,之中和之后进行讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号