首页> 外文会议>USSD(United States Society on Dams) Annual Conference >REMOVAL OF LARGE DAMS AND SITE RESTORATION - BREACHING OFBIRCH RUN DAM
【24h】

REMOVAL OF LARGE DAMS AND SITE RESTORATION - BREACHING OFBIRCH RUN DAM

机译:拆除大坝和修复场地-破坏桦木坝

获取原文
获取外文期刊封面目录资料

摘要

Prior to its removal from service in 2005, the 72-year old, 65-foot high, 700-foot long earth fill Birch Run Dam was the number one dam on the Pennsylvania Department of Environmental Protection's (PADEP) Division of Dam Safety's (Division of Dam Safety) list of unsafe dams. Located in Micheaux State Forest in south central Pennsylvania, the water supply dam represented a high hazard potential to the downstream population of over 11,000. Persons at risk included residents of Chambersburg, PA, seven nearby townships and three schools with a combined school population of 2,200. The Division of Dam Safety requested the dam owner, the Borough of Chambersburg (Borough), to address inadequate spillway capacity and other dam safety deficiencies or remove the dam from service. Alternatives studies were performed for repair, replacement and removal, which considered costs and impacts on the stream environment, wetlands, forest, and system safe yield. This paper presents the removal of Birch Run Dam as a case study and includes lessons learned from this project.
机译:在2005年停运之前,这座具有72年历史,高65英尺,长700英尺的土层桦木运行水坝是宾夕法尼亚州环境保护部(PADEP)大坝安全司(分区)的第一大坝。大坝安全)列表中的不安全大坝。供水大坝位于宾夕法尼亚州中南部的Micheaux州立森林中,对下游11,000多人构成了巨大的潜在危害。面临危险的人包括宾夕法尼亚州钱伯斯堡的居民,附近的七个乡镇和三所学校,学校总人数为2200人。大坝安全司要求大坝所有者钱伯斯堡镇(自治市)解决溢洪道容量不足和其他大坝安全缺陷的问题,或将大坝停运。进行了替代性研究以进行维修,更换和拆除,其中考虑了成本以及对河流环境,湿地,森林和系统安全产量的影响。本文以案例研究的形式介绍了拆除Birch Run Dam的情况,并包括从该项目中学到的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号