THE USE OF SPREADSHEET PROGRAMS AS A TOOL IN RESERVOIRDESIGN AND OPTIMIZATION

机译:使用电子表格程序作为储层设计和优化工具

获取原文

摘要

The rapid increase in population in the central and southern regions of Florida has forced water supply utilities to identify increased water storage capacity. Florida does not typically come to mind when dams and reservoirs are discussed, and historically there has been only limited construction of new storage reservoirs in the peninsula of Florida due to the little topographic relief of the area. Consequently there are few obvious sites for construction of an impoundment across a drainage channel, particularly in the near-coast areas. A feasibility study involving detailed evaluations of reservoirs with four different net storage capacities (ranging from 6,000 acre-feet to 18,000 acre-feet) was recently performed to identify an optimal off-stream, above-ground reservoir in southwestern Florida to address the increasing water requirements of the region. Considering the site conditions (e.g. topography, embankment construction material, seepage, and evaporation), a multitude of embankment geometry alternatives were initially postulated to provide the required storage volume. However, an efficient and logical storage reservoir geometry satisfying the site conditions and requirements was not obvious. Therefore, a series of detailed spreadsheets with associated plots was developed and calibrated for each storage size to optimize the design of the embankment cross-section and footprint. Evaluation of each of the alternatives considered a number of factors including embankment dimensions such as crest width, freeboard, slopes, and internal zoning; spoil and borrow quantities; seepage and evaporative losses; and reservoir footprint alternatives as well as estimates of unit prices of the primary construction features. Based on an evaluation of the alternatives, investigation and final design were performed for the resulting optimized configuration. Final design is underway with construction slated to begin in 2007. The optimized reservoir design is an 18,000 acre-foot balanced cut and fill earth embankment approximately 40 feet high with a geomembrane core, a slurry cutoff wall, and chimney and finger drains.
机译:佛罗里达州中部和南部地区人口的迅速增加迫使供水公用事业公司确定增加的蓄水能力。在讨论水坝和水库时,通常不会想到佛罗里达,而且从历史上看,由于该地区的地形地形不大,因此在佛罗里达半岛上新储水库的建设仅是有限的。因此,几乎没有明显的地点可以在整个排水通道上建造蓄水库,特别是在近岸地区。最近进行了一项可行性研究,包括对具有四种不同净储水量(范围从6,000英亩-英尺至18,000英亩-英尺)的水库进行详细评估,以确定佛罗里达西南部的最佳离岸,地上水库,以解决水量不断增加的问题。该地区的要求。考虑到场地条件(例如地形,路堤建筑材料,渗流和蒸发),最初假定了多种路堤几何形状替代方案,以提供所需的存储量。但是,满足现场条件和要求的有效且合乎逻辑的储层几何形状并不明显。因此,针对每种存储大小,开发并校准了一系列带有相关图的详细电子表格,以优化路堤横截面和占地面积的设计。对每个备选方案的评估均考虑了许多因素,包括路堤尺寸,例如波峰宽度,干舷,坡度和内部分区;破坏和借入数量;渗流和蒸发损失;和水库足迹替代方案以及主要建筑特征的单价估算。基于对替代方案的评估,对最终的优化配置进行了调查和最终设计。最终设计正在进行中,工程定于2007年开始。优化的水库设计是一个约18,000英亩-英尺的平衡挖方和填方土堤,高度约40英尺,带有土工膜芯,泥浆防渗墙以及烟囱和手指排水装置。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号