首页> 外文会议>Systems Engineering: Key to Intelligent Enterprises >Using Stakeholder Analysis to Define the Problem in Systems Engineering
【24h】

Using Stakeholder Analysis to Define the Problem in Systems Engineering

机译:使用涉众分析确定系统工程中的问题

获取原文

摘要

The first step in most system life cycles is the problem definition. Stakeholder analysis is a key technique to insure the problem has been fully and completely described before we attempt to obtain a solution to the problem. We identify and describe the three most common techniques for stakeholder analysis: interviews, focus groups, and surveys. We compare the three techniques using five criteria: time commitment of participants, ideal stakeholder group, preparation, execution, and analysis. We identify best practices to make stakeholder analysis both effective and efficient. This paper will aid the new practitioner and student of systems engineering as they organize and execute an effective stakeholder analysis, which is critical to the success of any systems engineering project.
机译:在大多数系统生命周期中的第一步是问题定义。利益相关者分析是确保在尝试获取问题的解决方案之前已完整而完整地描述问题的一项关键技术。我们确定并描述了用于利益相关者分析的三种最常见的技术:访谈,焦点小组和调查。我们使用五个标准比较这三种技术:参与者的时间投入,理想的利益相关者小组,准备,执行和分析。我们确定最佳实践,以使利益相关者分析既有效又高效。本文将帮助系统工程新学员和学生组织和执行有效的利益相关者分析,这对于任何系统工程项目的成功都是至关重要的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号