首页> 外文会议>AWWA water quality technology conference exposition >Numerical and experimental study of a low load High Rate Sand Ballasted Technology
【24h】

Numerical and experimental study of a low load High Rate Sand Ballasted Technology

机译:低负荷高速率砂石压载技术的数值与实验研究

获取原文
获取外文期刊封面目录资料

摘要

This paper presents a new high rate ballasted flocculation technology operating at very lowflow rates. This pilot unit was optimized thanks to the Computational Fluid Dynamicsmodeling of the mixing tanks and settling zone. One validated the designed unit is comparedin terms of turbidity reduction to a full scale unit installed in the L’Assomption DrinkingWater Plant (23600 m3/d , Quebec, Canada). The full scale unit operates with a 99% turbidityreduction, the pilot unit with a 1.44m3/h allowed to reach a 98% of turbidity reduction with arise rate of 40m/h.
机译:本文提出了一种新的高速率压载絮凝技术,该技术可在非常低的温度下运行 流量。通过计算流体动力学优化了该先导单元 混合罐和沉降区的建模。一个经过验证的设计单位进行了比较 在降低浊度方面,已安装在L'Assomption饮水机中的满刻度单元上 水厂(23600 m3 / d,加拿大魁北克)。满刻度单元的浊度为99% 减少量,以1.44立方米/小时的中试单元可以达到减少混浊度98%的效果, 上升速度为40m / h。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号