EXPERIENCES WITH OPEN ENDED PIPE PILE PLUGGING IN THE ATLANTIC COASTAL PLAIN

机译:大西洋沿海平原中端管开端堵头的经验

获取原文

摘要

Open ended pipe (OEP) piles are frequently used as a deep foundation solution in the Atlantic Coastal Plain (ACP) physiographic province. Typically, these piles act as low displacement piles during installation as the pile advances through the soil. However, if the soil plug becomes stationary within the pile, the pile acts as a full displacement pile. Plugging of an OEP pile can have significant effects on pile design and installation. Typically, measurements of pile plugging are conducted after pile installation is completed by measuring the depth to the soil plug and the embedment depth of the pile. The following paper presents the results of eight case histories of open ended pipe piles with pile plugging measurements in the Atlantic Coastal Plain. For each case history, the individual pile plug length ratio (PLR) and incremental fill ratio (IFR) was determined and the plug behavior during static and/or dynamic load testing (if available) was examined. Examination of the case history data showed that the piles experienced little plugging during installation, although pile plugging did increase with depth. In addition, the increase in measured tip capacity with time from pile installation suggests that OEP piles driven in ACP soils act as plugged with time.
机译:在大西洋沿岸平原(ACP)的地理省份中,开放式管道(OEP)桩经常用作深层基础解决方案。通常,当桩在土壤中前进时,这些桩在安装过程中充当低排量桩。但是,如果土壤塞在桩内变得静止,则桩将充当全位移桩。 OEP桩的堵塞会对桩的设计和安装产生重大影响。典型地,在桩安装完成之后,通过测量到土壤塞的深度和桩的埋入深度来进行桩堵塞的测量。以下文章介绍了大西洋沿海平原的八种开放式管桩的案例历史记录,并进行了桩堵测量。对于每个案例历史记录,确定单独的桩塞长度比(PLR)和增量填充比(IFR),并检查静态和/或动态载荷测试(如果可用)期间的桩头行为。对案例历史数据的检查表明,尽管桩的堵塞确实随着深度的增加而增加,但在安装过程中桩几乎没有堵塞。另外,随着桩安装时间的增加,测得的桩顶容量随时间的增加表明,在ACP土中打入的OEP桩会随着时间的推移而堵塞。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号