APPLICATIONS OF MASTER PLANNING USING PERA METHODOLOGY (IEC/ISO 62264) FORMERLY ISA SP95

机译:使用PERA方法的主计划应用(IEC / ISO 62264)以前是ISA SP95

获取原文

摘要

This paper introduces the PERA (Purdue Enterprise Reference Architecture) methodology concepts and their application to EMP (enterprise master planning) in the upstream oil and gas industry. Enterprise Master planning experience presented here is related to Engineering Procurement Construction type of new projects with the objective of early stage systems integration to reduce schedules & capital costs, OR the Operations and Maintenance type of projects with the objective of improving production rates or throughput of an existing operating facility. The Master Planning Methodology that we have used for various projects is based upon the methodology that is referenced in ANSI/ISA S95.00.01-2001 Appendix D, which is now adopted internationally as IEC62264-1. PERA's totally generic nature makes it applicable to any industry. The paper discusses three examples from different projects. One application example is from an existing pipeline network where the number of unplanned shut downs at pump stations were 2 to 3 times greater for the recently upgraded fully redundant PLC and telecommunications systems, when compared to the old hard wired relay logic systems which were still in operation at some of their existing pump stations. A second application example shows the positive results from implementing a standardized local SCADA/PLC control and telecommunications system interfacing with a centralized SCADA and Telecommunications for a new facility which was also implemented in the same region. After about Four (4) years of operations the non redundant PLC with redundant network telecommunications architecture had no unplanned shutdowns. The success story was possible primarily because of acceptance of the importance of the system integration requirements in the human sides of the enterprise organization. A third example is that of effective cost benefit, and bid analysis at a very early stage of the project using the techniques from the Master Panning Handbook based upon PERA methodology. This paper uses some of its material from a paper that was presented at the ISA Annual conference in Chicago; EXPO 2005.This paper has a different focus at A & M University. The Focus at A & M is on new technology & communications.
机译:本文介绍了PERA(PURDUE企业参考架构)方法论概念及其在上游石油和天然气工业中的EMP(企业硕士规划)的应用。这里提出的企业硕士规划经验与工程采购建设类型的新项目有关,目的是早期系统集成,以减少时间表和资本成本,或者具有提高生产率或吞吐量的项目的运营和维护类型现有的运营设施。我们用于各种项目的总体规划方法是基于ANSI / ISA S95.00.01-2001附录D中引用的方法,该方法现在通过国际IC62264-1。 PERA完全通用的性质使其适用于任何行业。本文讨论了来自不同项目的三个例子。一个应用示例来自现有的管道网络,当仍然存在的旧硬件中继逻辑系统相比,泵站的泵站的未预期关闭的次数的数量越多为2至3倍。在一些现有泵站的操作。第二个应用示例显示了通过实施标准化本地SCADA / PLC控制和电信系统的正面结果与集中式SCADA和电信,用于在同一地区实施的新设施。大约四(4)多年的操作后,非冗余PLC与冗余网络电信架构没有计划生意久停机。成功的故事主要是可能的,主要是因为接受企业组织人体方面的系统整合要求的重要性。第三个例子是使用基于PERA方法的主机平移手册的技术在项目的一个非常早期阶段的有效成本效益和出价分析。本文采用其在芝加哥ISA年会举行的纸上的一些材料; 2005年世博会。本文对A&M大学有不同的重点。 A&M的重点是新技术与通信。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号