Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Australia.Extracting approximately 4.5m of the Goonyella Middle seam using a single longwall, the mine produces 5 to 6 Mt per annum.The weak coal (4.5 MPa), low strength laminated immediate roof, and strong upper roof sandstones, make operation of the longwall at depths in excess of 250m geotechnically challenging. In the past, there have been a number of production delays due to geotechnical issues. Roof instability resulted in a long stoppage on Longwall 105, and the eventual relocation of the face further outbye in the block. (Figure 1).When mining commenced in LW106, there was a requirement for uninterrupted production, particularly in the more demanding inbye area of the panel. Following discussions with a number of Geotechnical experts, it was decided to narrow the face, and test the theories of reduced face weighting due to spanning of the goaf across the panel.A new on line chock monitoring system, and microseismic monitoring was installed in order to characterise the difference in the rockmass response, as the panel width changed from 175m, to 265m, and then 300m.The nature of the goaf formation and impacts on face loading and production are discussed, having the unique opportunity of three different face widths within the same area.
机译:莫兰巴北部(Moranbah North)是现代的长壁开采作业,在昆士兰州中部的北部博恩盆地(Bowen Basin)开采优质炼焦煤。澳大利亚Moranbah North Coal(MNC)由澳大利亚Anglo Coal拥有并运营。 该矿井仅用一个长壁开采就可开采约4.5m的戈尼埃拉中层煤层,年产量为5至6吨。 薄弱的煤层(4.5 MPa),低强度的层压直接顶板以及坚硬的上部顶板砂岩,使得长壁开采在深度超过250m的岩土工程上具有挑战性。过去,由于岩土工程问题,出现了许多生产延误。顶板的不稳定性导致Longwall 105的长时间停顿,最终使工作面重新定位在该块中。 (图1)。 LW106开采开始时,需要不间断的生产,尤其是在面板要求更高的中间区域。经过与许多岩土工程专家的讨论,决定缩小工作面,并测试由于采空区跨面板而减少工作面权重的理论。 为了表征岩体响应的差异,安装了一个新的在线阻塞监测系统和微震监测系统,当面板宽度从175m变为265m,然后变为300m时。 讨论了采空区形成的性质及其对工作面负荷和生产的影响,这些工作具有在同一区域内拥有三个不同工作面宽度的独特机会。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号