Moranbah North Tests the Critical Caving Theories: Every Geotech Engineer's Dream, the Ability to Get More than Two Points on a Curve

机译:Moranbah North测试临界理论:每个土工工程师的梦想,在曲线上获得超过两点的能力

获取原文

摘要

Moranbah North is a modern longwall operation mining premium coking coal in the Northern Bowen Basin, Central Queensland. Australia Moranbah North Coal (MNC) is owned and operated by Anglo Coal Australia. Extracting approximately 4.5m of the Goonyella Middle seam using a single longwall, the mine produces 5 to 6 Mt per annum. The weak coal (4.5 MPa), low strength laminated immediate roof, and strong upper roof sandstones, make operation of the longwall at depths in excess of 250m geotechnically challenging. In the past, there have been a number of production delays due to geotechnical issues. Roof instability resulted in a long stoppage on Longwall 105, and the eventual relocation of the face further outbye in the block. (Figure 1). When mining commenced in LW106, there was a requirement for uninterrupted production, particularly in the more demanding inbye area of the panel. Following discussions with a number of Geotechnical experts, it was decided to narrow the face, and test the theories of reduced face weighting due to spanning of the goaf across the panel. A new on line chock monitoring system, and microseismic monitoring was installed in order to characterise the difference in the rockmass response, as the panel width changed from 175m, to 265m, and then 300m. The nature of the goaf formation and impacts on face loading and production are discussed, having the unique opportunity of three different face widths within the same area.
机译:Moranbah North是昆士兰北部Bowen盆地北部鲍曼盆地的现代Longwall行动矿业优质焦煤。澳大利亚Moranbah北煤炭(MNC)由Anglo Coal Australia拥有和运营。用单个长墙提取约4.5M的GoOnsella中间煤层,矿井每年生产5至6吨。弱煤(4.5MPa),低强度层压立即屋顶,强大的上屋顶砂岩,在岩土上占地面积超过250米的深度。过去,由于岩土问题,已经存在许多生产延误。屋顶不稳定性导致长壁105上的长停止,并且在块中进一步远离面部的最终重新定位。 (图1)。当采矿在LW106开始时,需要不间断生产,特别是在小组的更苛刻的内部区域。随着众多岩土专家进行讨论,决定缩小面部,并在面板上跨越植物的跨越造成的减少的理论。安装了一个新的线路聊天监测系统,以及微震监测,以表征岩体响应的差异,因为面板宽度从175米变为265米,然后300米。讨论了GoF的形成和对面部装载和生产的影响,具有在同一区域内具有三种不同面部宽度的独特机会。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号