首页> 外文会议>International Conference on Engineering Structural Integrity Assessment >A REVIEW OF FAILURE MODELS OF NUCLEAR POWER KEY EQUIPMENT AND COMPONENTS ASSEMBLY
【24h】

A REVIEW OF FAILURE MODELS OF NUCLEAR POWER KEY EQUIPMENT AND COMPONENTS ASSEMBLY

机译:核电关键设备及组件装配的失效模型综述

获取原文

摘要

Nuclear power is now the urgent need for the development of economy in the world. It was reported that the nuclear power installed capacity of China will develop from 6.1GW in 2002 to 40GW in 2020. During the development of nuclear power industry, the problem perplexing people all the time is the safety of operating nuclear power plant(NPP). And the research regarding damage and failure models is pivotal for the safety of operating NPP. This paper reviews the failure models of nuclear power key equipment and components assembly, such as reactor pressure vessel(RPV), steam generator(SG) etc. The failure models of RPV mainly include irradiation embrittlement, stress corrosion cracking(SCC), and for SG mainly include inner-diameter SCC(IDSCC), outer-diameter SCC(ODSCC) etc. Besides, fatigue, wear and fretting damage are also common failure models in NPP.
机译:核电是当今世界经济发展的迫切需求。据报道,中国的核电装机容量将从2002年的6.1GW增长到2020年的40GW。在核电工业的发展过程中,一直困扰着人们的问题是核电厂的安全运行。对于破坏和失效模型的研究对于运行NPP的安全性至关重要。本文综述了核电关键设备及组件装配的失效模型,如反应堆压力容器(RPV),蒸汽发生器(SG)等。RPV的失效模型主要包括辐照脆化,应力腐蚀开裂(SCC)以及应力腐蚀开裂。 SG主要包括内径SCC(IDSCC),外径SCC(ODSCC)等。此外,疲劳,磨损和微动损伤也是NPP中常见的失效模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号