首页> 外文会议>Power and Energy Systems >HEAD-DEPENDENT MAXIMUM POWER GENERATION IN SHORT-TERM HYDRO SCHEDULING USING NONLINEAR PROGRAMMING
【24h】

HEAD-DEPENDENT MAXIMUM POWER GENERATION IN SHORT-TERM HYDRO SCHEDULING USING NONLINEAR PROGRAMMING

机译:非线性规划的短期水电调度中与头相关的最大发电量

获取原文

摘要

This paper is on the problem of short-term hydro scheduling. We propose a method, based on nonlinear programming, which considers hydroelectric power generation as a nonlinear function of water discharge and . of the head. The main contribution of this paper is that the maximum power generation is also considered as head-dependent in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve a case study based on one of the Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimization methods based on linear programming that ignore head dependence.
机译:本文是关于短期水力调度的问题。我们提出了一种基于非线性规划的方法,该方法将水力发电视为排水和的非线性函数。的头。本文的主要贡献在于,最大发电量也被认为是与头有关的,以便获得更现实和可行的结果。所提出的方法已成功应用于解决基于葡萄牙级联水力发电系统之一的案例研究,与基于线性规划的忽略头依赖的经典优化方法相比,该方法在可接受的计算时间内提供了更高的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号