首页> 外文会议>USSD(United States Society on Dams) Annual Conference >FEASIBILITY STUDY AND PRELIMINARY DESIGN OF UNION PARK DAM
【24h】

FEASIBILITY STUDY AND PRELIMINARY DESIGN OF UNION PARK DAM

机译:联合公园坝的可行性研究和初步设计

获取原文

摘要

A preliminary hydrologic evaluation of the drainage basin of Union Park Reservoir was completed to determine the probable maximum flood (PMF) and hydrologic loading of the dam. An opinion of the probable construction/project costs was prepared for the main 575-ft.-high RCC gravity dam and three smaller RCC (saddle) dams to be constructed at the north end of the reservoir. A core drilling/rock testing program and cost estimate was developed for implementation during the next phase of the feasibility study.
机译:已完成对联合公园水库流域的初步水文评估,以确定可能的最大洪水(PMF)和大坝的水文负荷。对于水库北端拟建的575英尺高的RCC主重力坝和三座较小的RCC(鞍形)水坝,已准备了可能的建设/项目成本意见。制定了核心钻探/岩石测试计划和成本估算,以在可行性研究的下一阶段实施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号