首页> 外文会议>USSD(United States Society on Dams) Annual Conference >AUTOMATED OUTLET STRUCTURE DESIGN FOR WINDSOR LAKE TO IMPROVE IRRIGATION OPERATIONS AND ATTENUATE FLOOD FLOWS
【24h】

AUTOMATED OUTLET STRUCTURE DESIGN FOR WINDSOR LAKE TO IMPROVE IRRIGATION OPERATIONS AND ATTENUATE FLOOD FLOWS

机译:温莎湖的自动出口结构设计,可改善灌溉操作并减轻洪水流量

获取原文

摘要

Windsor Lake (Kern Reservoir) serves as a storage facility, an equalizer reservoir for the Greeley No. 2 Canal, and a regional detention pond for the Windsor Basin. Rapid urbanization surrounding the Town of Windsor results in the need for a regional detention pond for a portion of the nearby Law Basin. Windsor Lake is capable of serving this purpose if several feet of reservoir storage are surrendered. The New Cache La Poudre Irrigating Company, NCLPIC (owners of the Greeley No. 2 Canal), and Kern Reservoir and Ditch Company (owners of Windsor Lake) are in agreement with this scenario with the stipulation that the outlet structure is replaced with an automated structure to improve reservoir and canal operations for shareholders. Requirements for the new outlet structure are to control and measure irrigation releases up to the decreed canal capacity of 600 cfs, and serve as the primary spillway for 2 different 100-year flood scenarios. The first scenario models the existing conditions in the basins and the second models the future condition in which both basins are assumed to be fully urbanized. In addition, the Dam Safety Branch of the State Engineer's Office requires the structure to pass a flood event equating to 17% of the Probable Maximum Flood (PMF). Furthermore, the structure is required to be capable of functioning during the winter months to measure and control small releases for augmentation purposes. Two alternative designs were evaluated during a feasibility study. Rubicon Flume Gates'"1, a type of overshot gate, are utilized in the final design to meet the outlet structure requirements. The new structure gives NCLPIC efficient control over the discharges in their system as well as reducing the flood potential for downtown Windsor.
机译:温莎湖(克恩水库)用作存储设施,格里利第二运河的均衡水库和温莎盆地的区域滞留池。温莎镇周围的快速城市化导致需要对附近的法律盆地的一部分建立区域拘留池。如果交出数英尺的水库,温莎湖将能够实现这一目的。 New Cache La Poudre灌溉公司,NCLPIC(格里利第二运河的所有者)以及Kern Reservoir and Ditch Company(温莎湖的所有者)都同意这种方案,并规定将出水口结构替换为自动改善股东的水库和运河运营的结构。新出口结构的要求是控制和测量高达600 cfs的运河排水量,并作为两种不同的100年洪水方案的主要溢洪道。第一种情况模拟了流域的现有条件,第二种情况模拟了假定两个流域都已完全城市化的未来条件。此外,国家工程师办公室的大坝安全部门要求结构通过洪水事件,该事件等于最大可能洪水(PMF)的17%。此外,要求该结构能够在冬季月份起作用,以测量和控制较小的释放量以用于增强目的。在可行性研究中评估了两种替代设计。在最终设计中,使用了Rubicon Flume Gates的“ 1”式过冲门,以满足出口结构的要求。新结构使NCLPIC能够有效控制其系统中的排水,并降低温莎市中心的洪水泛滥潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号