DIAMOND VALLEY LAKE, OBSERVATIONS DURING INITIAL FILLING

机译:钻石谷湖,初次注水时的观察

获取原文

摘要

Diamond Valley Lake is a new 800,000 acre-foot reservoir near Hemet, California. The reservoir is constructed in an open ended east-westerly valley with a low range of hills to the north. There are three dams enclosing the reservoir; a 284-foot tall West Dam and a 184-foot tall East Dam enclosed both ends of the valley and a 129-foot tall Saddle Dam filled a low area of the north rim hills forming the north side of the reservoir. All three dams have earthen cores buttressed on both sides by rockfill shells. The dams were extensively instrumented during construction by embedded piezometers, inclinometers, settlement sensors in the cores and foundations and the crests, upstream and downstream were instrumented by pillar-mounted and surface-mounted survey points and accelerographs. The piezometers have been used to monitor water levels in the cores and foundations and the remaining instruments to monitor any potential vertical and horizontal movements within the cores and at the crests, upstream, and downstream areas. The dams were completed in late 1999 and initial filling was immediately commenced; the reservoir is now fully in operation. Since the completion, the three dams have been inspected numerous times. The instruments have been monitored systematically using Global Positioning System and Automated Data Acquisition System during the initial filling as well as the normal reservoir operation. Instrumentation readings have been used to evaluate as-built deformation/compressibility and hydraulic characteristics of the core and shell materials. Observation of the performance of the three dams and appurtenant structures will be described since the initial filling.
机译:钻石谷湖是加利福尼亚州赫米特附近的一个新的800,000英亩英尺的水库。该水库建在一个开放的东西向山谷中,向北倾斜的山脉很少。有三座水坝围着水库。一个284英尺高的西水坝和一个184英尺高的东水坝围住了山谷的两端,还有一个129英尺高的鞍形水坝填满了形成水库北侧的北缘山丘的一小块区域。这三个水坝的土芯两侧均被堆石壳支撑。大坝在建造过程中通过嵌入式测压仪,测斜仪,岩心和地基中的沉降传感器进行了广泛的测量,上游和下游的波峰通过柱上和表面安装的测量点和加速度计进行了测量。压力计已用于监测岩心和地基中的水位,其余的仪器则用于监测岩心内以及波峰,上游和下游区域的任何潜在的垂直和水平运动。大坝于1999年底完工,并立即开始了最初的填充工作。水库现已完全投入使用。自竣工以来,对三座水坝进行了无数次检查。在初始注油以及正常油藏操作过程中,已使用全球定位系统和自动数据采集系统对仪器进行了系统监控。仪器读数已用于评估芯和壳材料的建成变形/可压缩性和水力特性。自初始填充以来,将描述对三个水坝和附属建筑物性能的观察。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号