AN OVERVIEW OF THE U.S. ARMY CORPS OF ENGINEERS' SCREENING FOR PORTFOLIO RISK ASSESSMENT FOR DAM SAFETY PROGRAM

机译:美国陆军工程兵对大坝安全计划的投资组合风险评估的概述

获取原文

摘要

The United States Army Corps of Engineers (US ACE) has an inventory of over 600 dams. The main purpose of many of these dams is for flood control, but there are a significant number of dams primarily used for navigation. Additional benefits at many of these projects are provided through hydropower generation, recreation, and irrigation for farmers. Many of the dams are quite old and represent an aging infrastructure across the inventory. In addition, leaner budgets relative to the need for repairs across the aging system require that USACE invest wisely in order to efficiently use available funds to reduce the greatest risks across the inventory. Previously, individual projects with perceived deficiencies were evaluated separately by the responsible district. This evaluation was not compared in any programmatic way to other USACE dams being evaluated for deficiencies. In order to improve the process of making risk-based decisions across the entire spectrum of USACE dams, the Screening for Portfolio Risk Assessment (SPRA) for the USACE Dam Safety Program was initiated during the summer of 2005. This effort represents the first level of a multiple phased effort to bring full scale risk assessment to the decision-making regarding making investment decisions associated with dam safety by linking engineering reliability with economic and life loss impacts on a relative scale. The SPRA effort involved the development of a tool for evaluating the relative life and economic risk of dam failures for a variety of deficiencies across the inventory of USACE dams. This paper will focus on the basic aspects of the evaluation tool as well as the process by which the screening was completed.
机译:美国陆军工程兵团(US ACE)拥有600多个水坝的清单。这些水坝中的许多水坝的主要目的是防洪,但是有大量水坝主要用于航行。通过为农民提供水力发电,娱乐和灌溉,为许多这些项目带来了更多好处。许多水坝都很老,代表了整个清单中老化的基础设施。此外,相对于老化系统中需要维修的精简预算要求USACE进行明智的投资,以便有效利用可用资金来降低整个清单中的最大风险。以前,有明显缺陷的单个项目由负责地区分别进行评估。并未以任何编程方式将此评估与正在评估缺陷的其他USACE大坝进行比较。为了改善在USACE大坝的各个方面做出基于风险的决策的过程,USACE大坝安全计划的组合风险评估筛选(SPRA)在2005年夏季开始。通过将工程可靠性与相对规模的经济和生命损失影响联系起来,分阶段进行的多阶段工作,以将全面的风险评估纳入与大坝安全相关的投资决策决策中。 SPRA的工作涉及开发一种工具,用于评估USACE大坝清单中各种缺陷的大坝故障的相对寿命和经济风险。本文将重点介绍评估工具的基本方面以及完成筛选的过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号