首页> 外文会议>Proceedings of the 41st International Universities Power Engineering Conference >OPTIMIZED MAIN PROTECTION SCHEME DESIGN OF 600MW HYDRO GENERATOR IN PUBUGOU POWER STATION
【24h】

OPTIMIZED MAIN PROTECTION SCHEME DESIGN OF 600MW HYDRO GENERATOR IN PUBUGOU POWER STATION

机译:蒲布沟电厂600MW水轮发电机优化主保护方案设计。

获取原文

摘要

The paper analyzed all the possible faults that may happen in stator of Pubugou 600MW multi-branch hydro generator. And transient electrical characteristics of these faults are simulated by simplified simulation model, which is constructed based on dual damper in each pole principle. Based on simulation data, the protection effects of different protection theories under different stator branch grouping modes on the neutral side are analyzed, and Pubugou generator optimized main protection scheme is proposed, which ensure the safety working for the generator and provide the references for the related engineering application and research work.
机译:本文分析了瀑布沟600MW多分支水轮发电机定子可能发生的所有故障。通过简化的仿真模型对这些故障的暂态电气特性进行仿真,该仿真模型是在每个极点原理的双阻尼器的基础上构造的。基于仿真数据,分析了中性侧不同定子支路分组模式下不同保护理论的保护效果,提出了瀑布沟发电机优化的主保护方案,为发电机的安全运行提供了参考。工程应用和研究工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号