EXCAVATION SUPPORT AT THE CAPITOL VISITOR CENTER IN WASHINGTON DC

机译:华盛顿特区卡皮托尔游客中心的挖掘支持

获取原文

摘要

In 2002, excavation support work commenced on the Capitol Visitor Center project located adjacent to the nation's Capitol building in Washington, D.C. The outlying work (Slurry Wall Work at Main Site is not discussed) consisted of providing excavation support for a new truck tunnel approximately 1900 feet long up to 50 feet deep as well as support for the new underground auditorium and Library of Congress tunnel. The excavation support consisted of a combination of conventional drilled in soldier beams, lagging, tiebacks and braces; intricate underpinning inside the existing Capitol building; support of an existing Russell Tunnel; soil nailing and tiebacks underneath the existing Russell Tunnel; two temporary bridges; and a deep soil mixed wall with lateral support provided by braces. As part of an on-going research program, some of these braces were instrumented with strain gauges. The deep soil mixed wall was approximately 300 feet long and 65 feet deep on either side of the truck tunnel. Approximately 34,000 sf of deep soil mixed wall, 90,000 sf of conventional excavation support, 200 braces, and 320 tiebacks were installed. This paper describes the large scope and breadth of the project that required a variety of excavation support techniques. A few of the challenges in designing and installing the support of excavation are discussed. This paper also presents the results of the instrumentation program conducted on the deep soil mixed wall, which stood open for more than a year.
机译:2002年,与华盛顿特区国家国会大厦大楼相邻的国会大厦游客中心项目开始了挖掘支持工作。外围工作(未讨论主站点的泥浆墙工作)包括为大约1900年的新卡车隧道提供挖掘支持。长达50英尺的深度,以及对新的地下礼堂和国会图书馆隧道的支撑。基坑支护包括在士兵横梁,护板,回扣和撑杆中钻孔的常规工具的组合;现有国会大厦内部的错综复杂的基础;支持现有的罗素隧道;现有罗素隧道下方的土钉和绑扎物;两座临时桥梁;深墙混合墙,由支架提供侧向支撑。作为正在进行的研究计划的一部分,其中一些牙套已配备了应变仪。卡车隧道两侧的深土混合墙长约300英尺,深65英尺。大约安装了34,000平方英尺的深层土壤混合墙,90,000平方英尺的常规挖掘支撑,200个支撑和320个系固装置。本文描述了该项目的规模和广度,需要各种挖掘支持技术。讨论了在设计和安装基坑支护中遇到的一些挑战。本文还介绍了在开放了一年多的深层土壤混合墙上进行的仪器化程序的结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号