首页> 外文会议>International Conference on Industrial Engineering and Engineering Management >A Cooperation-planning Model Based on Time Window Constraint (ID: 3-002)
【24h】

A Cooperation-planning Model Based on Time Window Constraint (ID: 3-002)

机译:基于时间窗约束的合作计划模型(ID:3-002)

获取原文

摘要

This paper is based on a resource constrained active network project; the constraint of the local resource and time window constraint of the cooperation resource are considered simultaneously. And a cooperation-planning model is designed, according to the due time and total cost. And an extended CNP based on the permitted range for resource and time requests is presented. A larger task set in scheduling is on the permitting for the request of cooperation resource and time while the task manager itself may be permitted biding for tasks. As a result, the optimization space for the cooperation planning is enlarged. Finally, the genetic algorithm is given and the validity and feasibility of the model is. Proved by a case.
机译:本文基于资源受限的主动网络项目;同时考虑本地资源的约束和合作资源的时间窗口约束。根据所需的时间和总成本,设计了一个合作计划模型。并提出了基于资源和时间请求的允许范围的扩展CNP。在调度中设置的较大任务是在请求合作资源和时间时,而任务管理器本身可以被允许竞标任务。结果,扩大了合作计划的优化空间。最后给出了遗传算法,给出了模型的有效性和可行性。由一个案例证明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号