首页> 外文会议>International Conference on Industrial Engineering and Engineering Management >Risk Management of International DCS Projects Based on Multilevel Fuzzy Comprehensive Evaluation Model
【24h】

Risk Management of International DCS Projects Based on Multilevel Fuzzy Comprehensive Evaluation Model

机译:基于多级模糊综合评价模型的国际DCS项目风险管理

获取原文

摘要

According to the characteristics of international DCS project that benefit and risk coexist, the multilevel fuzzy comprehensive evaluation model covering Delphi, AHP (Analytic Hierarchy Process) and Fuzzy Comprehensive evaluation Model will be introduced into the international DCS project risk analysis. Taking Salah Al-Din Fuel Gas Power Plant DCS project In Iraq as an example, we successfully carries on the comprehensive evaluation of risk model. The evaluation results shows strong systemic and practical. It also provides strong support for project risk management and decision-making.
机译:根据国际DCS项目的特点,该项目的利益和风险共存,将介绍Delphi,AHP(分析层次结构)和模糊综合评估模型的多级模糊综合评价模型将被引入国际DCS项目风险分析。以伊拉克为例,以伊拉克·萨拉尔 - DIN燃气电厂DCS项目为例,我们成功地进行了风险模型的综合评价。评估结果表明强大的系统性和实用性。它还为项目风险管理和决策提供了强有力的支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号