首页> 外文会议> >A dynamic approach for scheduling dependent tasks on the Xavantes grid middleware
【24h】

A dynamic approach for scheduling dependent tasks on the Xavantes grid middleware

机译:在Xavantes网格中间件上调度依赖任务的动态方法

获取原文
获取外文期刊封面目录资料

摘要

A scheduler must consider the heterogeneity and communication delays when scheduling dependent tasks on a grid. The task scheduling problem is NP-Complete in general, what led us to the development of a heuristic for the associated optimization problem. In this work we present a dynamic approach to schedule dependent tasks onto a grid based on the Xavantes grid middleware. The developed dynamic approach is applied to the Path Clustering Heuristic (PCH), and introduces the concept of rounds, which take turns sending tasks to execution and evaluating the performance of the resources. The experiments show that the round-based dynamic schedule can minimize the effects of performance losses while executing processes on the grid.
机译:调度程序在网格上调度相关任务时必须考虑异构性和通信延迟。任务调度问题通常是NP-Complete,这导致我们开发了相关优化问题的启发式方法。在这项工作中,我们提出了一种动态方法,用于基于Xavantes网格中间件将相关任务安排到网格上。所开发的动态方法被应用于 Path Clustering Heuristic (PCH),并引入了 rounds 的概念,该概念轮流发送任务以执行并评估资源的性能。 。实验表明,基于 round 的动态计划可以在网格上执行流程时最大程度地降低性能损失的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号