首页> 外文会议>ISES (International Solar Energy Society) Solar World Congress;ASES (American Solar Energy Society) Annual Conference;National Passive Solar Conference >RESULTS FROM THE CALIFORNIA PV TESTING AND EVALUATION PROJECT: A THIRD-PARTY EVALUATION OF CURRENTLY AVAILABLE PV SYSTEMS
【24h】

RESULTS FROM THE CALIFORNIA PV TESTING AND EVALUATION PROJECT: A THIRD-PARTY EVALUATION OF CURRENTLY AVAILABLE PV SYSTEMS

机译:加利福尼亚州光伏测试和评估项目的结果:当前可用光伏系统的第三方评估

获取原文

摘要

Results are presented for the first six months of operation of the photovoltaic (PV) systems reviewed under the Large Systems portion of the Building Integrated PV Evaluation Project. This project, conducted by BEW Engineering, is providing side-by-side evaluation of commercial PV system and component technologies (www.pierminigrid.org org; details and real-time data are available at http://pierminigrid.showdata.org ; org). The information presented here is based on the second of five publicly-available reports detailing system design and documentation, installation, and performance. The final report, a Consumer Confidence Guideline, will summarize all of this information in a Consumer Reportsstyle format directed at the end user. This type of information is not currently available from any single independent source, and is greatly needed by the Pvbuying public. Though issues arose during the evaluation, our basic conclusion is that PV systems designed and installed properly, and rated appropriately, perform as expected.
机译:在建筑物综合光伏评估项目的大型系统部分中,对光伏(PV)系统运行的前六个月的结果进行了介绍。该项目由BEW Engineering进行,旨在对商用光伏系统和组件技术进行并行评估(www.pierminigrid.org org;有关详细信息和实时数据,请访问http://pierminigrid.showdata.org; org)。此处提供的信息基于五个可公开获得的报告中的第二个,详细描述了系统设计和文档,安装和性能。最终报告《消费者信心指南》将以针对最终用户的《消费者报告样式》格式汇总所有这些信息。目前无法从任何一个独立来源获得此类信息,Pvbuying公众非常需要这种信息。尽管在评估过程中出现了问题,但我们的基本结论是,光伏系统的设计和安装正确,额定值适当,可以按预期运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号