首页> 外文期刊>Energy Policy >Evaluating the impact of the administrative procedure and the landscape policy on grid connected PV systems (GCPVS) on-floor in Spain in the period 2004-2008: To which extent a limiting factor?
【24h】

Evaluating the impact of the administrative procedure and the landscape policy on grid connected PV systems (GCPVS) on-floor in Spain in the period 2004-2008: To which extent a limiting factor?

机译:在2004-2008年期间,评估行政程序和景观政策对西班牙地面并网光伏系统(GCPVS)的影响:在何种程度上有限制因素?

获取原文
获取原文并翻译 | 示例
           

摘要

The growth of the Spanish photovoltaic (PV) sector in the period 2004-2008 rendered Spain a prominent place among top worldwide countries. Yet, this growth was rather uneven across the different Spanish regions which raised the interest on the drivers ultimately effecting these disparities. Especially controversial were the arguments about the influence of the administrative procedure and the landscape policy on the development of GCPVS on-floor. This study therefore discloses both two elements and evaluates their impact in a group of PV prominent Spanish regions and Catalonia, the latter used as a benchmark because of its comprehensive and stringent regulation on landscape protection, which was accused by the PV industry of thwarting the development of the GCPVS on-floor. Both quantitative and qualitative analyses were carried out. In particular two indexes were elaborated to determine the consistency of the arguments pointing to the landscape protection policy as a decisive barrier to GCPVS growth. First, when the analysis is made in relative terms, the ranking of PV prominent regions changes and many of the differences vanish. Second, rather than the preeminence of a landscape protection policy what really matters for GCPVS on-floor growth is the administrative procedure and the processing enabling its implementation.
机译:在2004年至2008年期间,西班牙光伏(PV)部门的增长使西班牙在全球主要国家中占据了突出的位置。然而,西班牙不同地区之间的增长相当不平衡,这引起了最终导致这些差距的司机的兴趣。有关行政程序和景观政策对地面GCPVS发展的影响的论点尤其引起争议。因此,这项研究揭示了这两个要素,并评估了它们在一组西班牙光伏突出地区和加泰罗尼亚地区的影响,加泰罗尼亚由于对景观保护的全面和严格规定而被作为基准,被光伏行业指责阻碍了发展。地面上的GCPVS。进行了定量和定性分析。特别是,精心设计了两个指数来确定论点的一致性,这些论点指出景观保护政策是GCPVS增长的决定性障碍。首先,当用相对术语进行分析时,PV突出区域的排名会发生变化,并且许多差异都会消失。第二,对于GCPVS地面生长而言,真正重要的不是景观保护政策,而是行政程序和支持其实施的流程。

著录项

  • 来源
    《Energy Policy》 |2013年第12期|147-167|共21页
  • 作者单位

    Department of Electrical Engineering, Escola Universitaria d'Enginyeria Tecnica Industrial de Barcelona (EUETIB), Campus Urgell, Universitat Politecnica de Catalunya, Carrer del Comte d'Urgell 187, 08036 Barcelona, Spain;

    Department of Electrical Engineering, Escola Universitaria d'Enginyeria Tecnica Industrial de Barcelona (EUETIB), Campus Urgell, Universitat Politecnica de Catalunya, Carrer del Comte d'Urgell 187, 08036 Barcelona, Spain;

    Department of Business Management, Escola Tecnica Superior d'Enginyeria Industrial de Barcelona (ETSEIB), Universitat Politecnica de Catalunya, Av. Diagonal 647, 08028 Barcelona, Spain;

    Department of Electronic Engineering, Escola Politecnica Superior d'Enginyeria de Vilanova i la Geltru (EPSEVG), Universitat Politecnica de Catalunya, Av. Victor Balaguer, s., 08800 Vilanova i la Geltru, Spain;

    Department of Electronic Engineering, Escola Politecnica Superior d'Enginyeria de Vilanova i la Geltru (EPSEVG), Universitat Politecnica de Catalunya, Av. Victor Balaguer, s., 08800 Vilanova i la Geltru, Spain;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Photovoltaic; Administrative procedure; Spain;

    机译:光伏行政程序;西班牙;

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号