DEVELOPMENT OF A STATE-OF-THE-ART PLANT PRODUCTIONPERFORMANCE MODEL FOR EUROPE’S LARGEST NGL PLANT

机译:开发欧洲最大的NGL工厂的最新工厂生产绩效模型

获取原文

摘要

K?rst? gas processing plant is an integrated part of the Norwegian gas transport infrastructure,owned by the Gassled Joint Venture. A plant expansion project (KEP 2005) is underway to increasethe design rich gas processing capacity from 74.5 MSm 3 /d (Million Standard cubic meter pr day) to 88MSm 3 /d by October 2005. This will strengthen the gas processing plant at K?rst? as the largest NGLplant in Europe. Rich gas is transported to K?rst? in two separate pipelines. In addition, condensateenters the plant in a separate pipeline. Sales gas is exported in two pipelines.The plant capacity has been expanded in several stages since start up of the Statpipe gasprocessing trains in 1985. With completion of KEP 2005, the plant will exhibit a relative high degreeof integration of the processing trains. This will allow for routing to the various trains for processing.Main objectives for the operations in the years to come will be maximum capacity utilization and CO2removal to comply with the sales gas obligations.Gassco and Statoil, on behalf of Gassled, have launched a project to develop a real timeoptimisation model, which is called Plant Production Performance Model (3PM).The paper describes the gas processing facilities, operational characteristics, productionobjectives and the business drivers for installing the 3PM. It is emphasized how the 3PM will beemployed to generate added value at the K?rst? gas processing plant.Invensys was awarded the contract to develop the 3PM. In order to meet the performancecriteria they employ an equation oriented approach to describe the plant operations adequately. Tosolve the large set of equations to determine set points to support the production objectives theInvensys SimSci ROMeo? program application is used.
机译:Krst?天然气加工厂是挪威天然气运输基础设施的组成部分, 由Gassled合资企业所有。工厂扩建项目(KEP 2005)正在增加中 设计丰富的气体处理能力从74.5 MSm 3 / d(百万标准立方米pr天)提高到88 MSm 3 / d截止2005年10月。这将加强K?rst?的天然气处理厂。作为最大的NGL 欧洲工厂。富气被输送到Krst?在两个单独的管道中。另外,冷凝水 在单独的管道中进入工厂。销售气体通过两条管道出口。 自Statpipe天然气启动以来,工厂的生产能力已分多个阶段进行了扩展 1985年开始进行加工。随着KEP 2005的完成,该工厂将展示出相对较高的程度。 加工火车的整合。这将允许路由到各种列车进行处理。 未来几年运营的主要目标将是最大的产能利用率和二氧化碳排放量 搬迁要遵守销售用气义务。 Gassco和Statoil代表Gassled启动了一个开发实时项目 优化模型,称为工厂生产绩效模型(3PM)。 该文件描述了气体处理设施,运行特点,生产 目标和安装3PM的业务驱动力。强调3PM将如何 用来在Krst?产生附加值?气体加工厂。 英维思(Invensys)获得了开发3PM的合同。为了满足性能 他们采用了一种以方程为导向的方法来充分描述工厂运营的标准。到 解决大型方程组以确定设定点以支持生产目标 英维思SimSci ROMeo?使用程序应用程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号