首页> 外文会议>SPE/EPA/DOE exploration and production environmental conference >Managing Risks and Uncertainties in Drill Cuttings Re-Injection in ChallengingEnvironments – Field Experience from Sakhalin Island
【24h】

Managing Risks and Uncertainties in Drill Cuttings Re-Injection in ChallengingEnvironments – Field Experience from Sakhalin Island

机译:在充满挑战的环境中管理钻屑再注入的风险和不确定性–来自萨哈林岛的现场经验

获取原文

摘要

Drilling waste disposal using hydraulic fracturing is often thepreferred waste management option because it can achievetrue zero discharge without being limited by the drillinglocation. This is particularly true for drilling operations inremote and challenging areas such as offshore Sakhalin Islandas there is no established infrastructure for drilling wastemanagement.This paper presents a case history of managinguncertainties and risks related to a drill cuttings re-injection(CRI) project offshore Sakhalin Island. Although there areuncertainties and risks with the CRI project in this case,regulatory requirements and the operator’s commitment tozero discharge made it the preferred option for drilling wastemanagement. Complicating the decision was a previousinjection well where cuttings settling made it inoperative.Thus, the only option was to inject the oily cuttings into adeviated well intended for future use as a development well,which posed a number of risks related to the proposed CRIoperation.Since this is the only option for drilling waste managementand loss of this well would have delayed the drilling programand field development for at least a year, managing the risksand uncertainties related to this CRI project and assurance of atrouble-free CRI operation were critical.This paper presents monitoring and diagnostic analysesthat were used for slurry design and optimization, pumpingprocedure design and optimization considerations, as well assolids transport modeling and planning length of shut-inintervals between batches. These quality assurance andoptimization measures were proven to be effective inmanaging the risks and uncertainties associated with thiscritical cuttings injection well off Sakhalin Island. At the time of this writing, more than 100,000 bbl of slurry and fluid hadbeen injected into this well without incident.
机译:通常采用水力压裂法处理钻井废物 首选的废物管理选项,因为它可以实现 真正的零排放,不受钻孔限制 地点。这对于在美国的钻井作业尤其如此 偏远和具有挑战性的地区,例如萨哈林岛近海 因为没有成熟的钻井废料基础设施 管理。 本文介绍了管理的案例历史 与钻屑回注有关的不确定性和风险 (CRI)项目在萨哈林岛近海。虽然有 在这种情况下,CRI项目的不确定性和风险, 法规要求和运营商的承诺 零排放使其成为钻探废料的首选 管理。使决定复杂化是先前的事 钻屑沉降使注入失效的井井。 因此,唯一的选择是将油屑加入到 偏向于将来用作开发井的井井有条, 这带来了与拟议的CRI相关的许多风险 手术。 因为这是钻井废物管理的唯一选择 而这口井的损失将延迟钻探计划 和现场开发至少一年,管理风险 与此CRI项目相关的不确定性以及对 无故障的CRI操作至关重要。 本文介绍了监视和诊断分析 用于泥浆设计和优化,泵送 程序设计和优化注意事项,以及 固体运输模型和计划的关闭时间 批次之间的间隔。这些质量保证和 优化措施被证明是有效的 管理与此相关的风险和不确定性 萨哈林岛附近的关键岩屑注入井。在撰写本文时,超过100,000桶的浆液 被注入该井而没有发生任何事故。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号