首页> 外文会议>International Conference on Ground Control in Mining >Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance
【24h】

Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

机译:美国西部多煤层的高墙采矿设定设计和性能

获取原文

摘要

With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall mining is performed by contract, with the system owner charging the mining company on a per ton basis, plus a mobilization fee For this arrangement to benefit both parties, geotechnical planning is required to minimize risk to highwall mining personnel and equipment, while maximizing coal recovery. This paper discusses how highwall mining has been successfully implemented at a large surface coal mine in Colorado, including design procedures, operational factors, and productivity. The operation includes an area where four seams are mined in succession from the lowermost upward, requiring careful attention to seam interaction issues.
机译:随着系统设计的进步推动了更高的生产率,安全性和煤炭回收率,高壁开采正成为延长露天矿储量的有吸引力的选择。通常,高墙采矿是按合同进行的,系统所有者按每吨向采矿公司收费,再加上动员费。为了使双方都受益,这项岩土工程计划需要将对高墙采矿人员和设备的风险降至最低,而最大限度地提高煤炭采收率。本文讨论了如何在科罗拉多州的大型露天煤矿成功实施高壁采矿,包括设计程序,运营因素和生产率。该作业包括一个区域,该区域从最下面的向上连续开采四个接缝,需要特别注意接缝相互作用问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号