DESIGN AND CONSTRUCTION OF THE SHOAL CREEK RAW WATER INTAKE AT LAKE LANIER

机译:兰尼尔湖浅滩暗流取水口的设计与施工

获取原文

摘要

The successful completion of the Shoal Creek Raw Water Intake and Pumping Station Project provides Gwinnett County's water system with added reliability and capacity. The project was completed accident free, within the contract time, and $800,000 below the original bid cost. The design of the project with a sub-surface pump station required minimal environmental impact during construction and leaves an esthetically pleasing and minimally intrusive product for the community. The success of the project is attributable in large part to the cooperative spirit exhibited by the parties.
机译:浅滩溪原水取水和泵站项目的成功完成为格威内特县的供水系统增加了可靠性和容量。该项目是在合同时间内无事故完成的,比原始投标价低了80万美元。具有地下泵站的项目设计要求在施工期间对环境的影响最小,并为社区留下美学上令人愉悦且侵入性最小的产品。该项目的成功很大程度上归功于各方展现出的合作精神。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号