首页> 外文会议>Water sources conference >Alstyle Apparel and Activewear Water Reuse Project
【24h】

Alstyle Apparel and Activewear Water Reuse Project

机译:Alstyle Apparel和Activewear水再利用项目

获取原文

摘要

On August 15, 2000, the Anaheim City Council approved a funding agreement between the City of Anaheim, the Metropolitan Water District of Southern California (MWD), and Alstyle Apparel and Activewear (Alstyle). The agreement provides partial funding for a Water Reuse Project (Project) at Alstyle's dyeing facility in Anaheim that will reduce its monthly water use by about 11 million gallons. Alstyle is a high quality producer and finisher of textile goods and is one of Anaheim Public Utilities' largest industrial water customers. The funding agreement requires MWD to provide Alstyle up to $309,309 over a five-year period, while the Project itself will save Alstyle about $222,000 annually in reduced operating costs. Anaheim Public Utilities is responsible for monitoring the Project, verifying and submitting quarterly invoices to MWD, and processing payments to Alstyle based on the associated water savings. The Project is estimated to save 401.7 acre-feet (131 million gallons) of water annually resulting in savings of over 655 million gallons of water over the five-year life of the contract. As one of Anaheim's largest industrial water users Alstyle incurs substantial charges for fresh water and sewer discharge and therefore chose to view water treatment and reuse as a fundamental operation of textile dyeing and finishing. The primary goal of the Project is the installation of a water reuse system that segregates bath cycles from the dye machines as reuse water and as sewer discharge water. The water reuse system is sized to handle up to 30 percent of the planned water consumption rate. This will allow Alstyle to expand its production volume without exceeding its sewer discharge capacity. Since the official date of commissioning, February 6, 2001, the Project is operating smoothly and efficiently, averaging water savings between 11-12 million gallons monthly, only slightly more than originally estimated. Since MWD's Board of Directors approved the Process Component of their Commercial, Industrial, and Institutional (CII) Conservation Program in 1997, Anaheim is the first of MWD's 26 member agencies to successfully negotiate a water process change funding agreement. Anaheim is pleased to be the first, and is anxious to enter into similar funding agreements with other Anaheim businesses in order to protect and preserve our California's water resources.
机译:2000年8月15日,阿纳海姆市议会批准了南加州大城市(MWD)和Alstyle Apparel和Activewear(Alstyle)的Anaheim市之间的资助协议。该协议为Anaheim的Alstyle在Alstyle染色设施的水重用项目(项目)提供了部分资金,该工程将减少其每月用水量约1100万加仑。 Alstyle是一家优质生产商和纺织品的优质产品,是Anaheim公用事业最大的工业用水客户之一。资金协议要求MWD在五年内提供高达309,309美元的Alstyle,而项目本身将每年减少约222,000美元的运营成本。 Anaheim公用事业公司负责监控该项目,核实和提交MWD的季度发票,并根据相关的水资源处理到Alstyle。该项目估计每年节省401.7英亩(1.31亿加仑)的水,从而在合同的五年生命中节省超过655万加仑的水。作为Anaheim最大的工业用水器之一,Alstyle Alstyle会导致淡水和下水道放电的大量费用,因此选择查看水处理并重用作为纺织染色和整理的基本操作。该项目的主要目标是安装水重用系统,该系统将染色机器分离浴缸循环作为再利用水和下水道排出水。水再利用系统尺寸适用于可处理计划耗水率的30%。这将允许Alstyle扩展其生产量而不超过其下水道放电容量。自2001年2月6日正式调试之日以来,该项目正在顺利,高效运营,每月均为11-12亿加仑的水资源,仅略高于最初估计。由于MWD的董事会批准了1997年的商业,工业和机构(CII)保护计划的流程组成部分,Anaheim是MWD的26个成员机构的第一个成功谈判水资源流程变更筹资协议。阿纳海姆很高兴成为第一个,并且急于与其他阿纳海姆企业签订类似的资金协议,以保护和保留我们加州的水资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号