首页> 外文会议>SPE annual technical conference and exhibition >Central Waste Treatment Facilities (CTRD) Reduce Drilling and Waste Management Costs in Heavy Oil Operations, Eastern Venezuela
【24h】

Central Waste Treatment Facilities (CTRD) Reduce Drilling and Waste Management Costs in Heavy Oil Operations, Eastern Venezuela

机译:中央废物处理设施(CTRD)降低委内瑞拉东部重油运营中的钻井和废物管理成本

获取原文

摘要

The Ameriven Central Waste Treatment Facilities (CTRD Centro de Tratamiento y Recuperación de Desechos), which were designed and implemented with the technical support of teams provided by a major drilling waste management service company, receives and processes heavy-oil drilling and production waste generated by operations in the Hamaca Project, located in the Faja Region of the Orinoco Belt in Venezuela. The CTRD operational strategy emphasizes the 4Rs: reduction, reuse, recovery, and recycling. Important cost savings have been achieved from: (1) the consolidation of waste treatment at one location near the source; and (2) the efficient waste management practices implemented by the fluids and waste management team, under contract with Petrolera Ameriven (Ameriven). The facility now serves as a model for similar operations in the region and has earned unconditional approval from governmental agencies and prominent companies with commercial interests in the area’s forests and resources. Over the life of the 30-year project, the facility will process the waste from approximately 250 to 500 wells. The current development production phase yields 80,000 bbl/day, with 190,000 bbl/day extra-heavy crude expected in the commercial production phase. Cost reductions related to waste management and disposal at this site are currently estimated at 22% (since commencement of operations) and are expected to improve further as the facility is used to full capacity. Several integrated processes are implemented for the efficient disposal of drilling waste products: thorough rig audits, solids-control equipment performance, rig, field, and plant supervision, dewatering, water treatment, and landfarming and landspreading of processed solids and cuttings.
机译:Ameriven中央废物处理设施(CTRD Centro de Tratamiento yRecuperaciónde Desechos)是在一家主要的钻井废物管理服务公司提供的团队的技术支持下设计和实施的,用于接收和处理由该公司产生的重油钻井和生产废物位于委内瑞拉奥里诺科带法亚地区哈马卡项目的运营。 CTRD的运营策略强调4R:减少,重复使用,回收和再循环。从以下方面实现了重要的成本节省:(1)在废物源附近的一个地点合并废物处理; (2)根据与Petrolera Ameriven(Ameriven)签订的合同,由流体和废物管理团队实施有效的废物管理做法。该设施现已成为该地区类似业务的典范,并已获得政府机构和对该地区森林和资源具有商业利益的知名公司的无条件批准。 在这个为期30年的项目的整个生命周期中,该设施将处理约250到500口井的废物。当前的开发生产阶段产量为80,000桶/天,预计在商业生产阶段为190,000桶/天的超重原油。目前估计与该场地废物管理和处置有关的成本降低(自开始运营以来)为22%,并且随着该设施的满负荷使用,预计将进一步提高成本。 为有效处置钻井废料,实施了多个集成流程:全面的钻机审核,固体控制设备性能,钻机,现场和工厂监督,脱水,水处理以及耕种和固体散布和切屑的土地播种。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号